In a recent OAC meeting, we walked the site and inspected some recent good changes: Work progressing! These changes, though good, have slowed down and delayed our construction. The project’s design was to leave a large portion of the ceiling exposed. However, as this was a remodel, we weren’t able to get a complete picture of …